Demolition and Reconstruction

The End: January 9, 2015

Internal walls down: January 8, 2015

1912 west side structure from down. Side walls out: January 6, 2015


Photo below from Google photo album by Matt. Link here for complete album.

Gym down, library wall opened January 5, 2015

December 29 Hydro disconnects power

Time Lapse Example. Not much to see at this point...